The process
Five steps that keep everyone on the same page
We start with measurement, so everything after it has something honest to improve against and you can watch the progress as it happens.
01
Audit
We start with what you already have: analytics, search performance, ad accounts if there are any, and the pages currently doing the selling. The point is to separate the problems costing you money from the ones that just annoy you. Almost every audit turns up something nobody had noticed, and every so often it turns out a much smaller piece of work will do the job. We're glad to say so when that happens.
Written findings ranked by likely revenue impact
Analytics and tracking accuracy check
Technical and content review of key pages
Competitive read on how you're positioned today
02
Strategy
We pin down what we're optimizing for and how we'll know it worked: the specific metric, where it sits today, and a realistic target with a date on it. Then we scope the work and spell out what we're deliberately leaving out. An honest list of exclusions is what keeps a project from quietly growing sideways.
Measurement plan with baseline numbers and targets
Page structure and messaging direction
Written scope with explicit exclusions
Timeline and milestone schedule
03
Design
We design a system, not a stack of pages: type scale, color tokens, components that fit together. It all happens against real copy on a staging URL you can pull up on your own phone. Static desktop mockups hide the problems that matter, and approving a picture isn't the same as approving a website.
Design system with color, type, and component tokens
Key page designs reviewable on a live staging URL
Responsive behavior resolved at every breakpoint
Accessibility contrast and focus states verified
04
Build
Speed and search structure are requirements here, not a cleanup pass we get to later. Everything lands in a repository you own from the first commit. Tracking goes in during the build instead of after, which is the only reliable way to have working measurement on launch day instead of a month later.
Production build hitting agreed performance targets
Analytics and conversion tracking verified end to end
Technical SEO: metadata, schema, sitemap, redirect map
Repository, deployment pipeline, and documentation handover
05
Grow
Launch is when the useful data starts showing up. We watch how real visitors behave, fix what only surfaces under real traffic, and hand you a ranked list of what to do next with the expected payoff attached. Staying on is genuinely optional, and the handover assumes you might take this in-house or to someone else later.
Post-launch monitoring and fixes
Reporting on the metrics defined in step two
Ranked list of what to improve next
Training walkthrough for your team
How we work
Four commitments that shape everything above
Measurement before opinions
Every project gets a baseline in week one. Without it, anything anyone says about improvement later is just a story, and stories are a bad basis for spending money.
Nothing gets approved from a picture
Work goes to a live staging URL you can pull up on your own phone. Static mockups hide the problems that only show up at real widths with real content.
Scope changes get written down
Requirements change, which is fine. What isn't fine is finding out at the end that the timeline moved with them. Changes get a written note on cost and schedule before anyone commits.
Handover that stands on its own
Documentation, your repository, your accounts. The test is whether another developer could take this over without calling us every day, and the answer should be yes.
Let's find out what your website could be doing
Tell us what you're trying to grow and where it's stuck right now. If we're not the right fit, we'll say so and point you somewhere better.